| http://www.w3.org/ns/prov#value | - Once the clock frequency is set to the requested frequency (i.e., the frequency indicated by the operating point change request) and the core temperature is set to the requested temperature, the controller 52 transmits an acknowledgement or other message indicating that the operating temperature and frequency of the core 42 have been set as requested, as indicated by block 131 of FIG. 6.
|