| http://www.w3.org/ns/prov#value | - Here, FIG. 2 is a flow chart to explain the control regarding the operation of detecting the welding of the switch 2 performed by the controller 60 of the inverter device 8, and FIG. 3 is a timing chart to explain the operation of the switch 2, switch 3 and the electrically driven compressor 10.
|